Power Problems Came up During Super Bowl Rehearsals
Eric Grubman, the league’s executive vice president of business operations, said officials noticed “fluctuations in the frequency of the power supply” during rehearsals, and feared the issue would pose problems for high-definition television cameras.
“Since we did not want any issues at halftime with TV cameras or other gear related to the frequency fluctuations, we decided it would be best to use generators designed for the type of power demand presented by the show,” Grubman said in a statement released on Tuesday.
During the disruption, players stretched and chatted with each other and waited patiently for the lights to return.
The 49ers, who had been outplayed to that point, scored 17 consecutive points after the game restarted but came up just short, losing 34-31.
Grubman said it was unlikely the outage had anything to do with the halftime spectacular by pop star Beyonce, whose show featured a dramatic pyrotechnics display.
“The power outage occurred well after the halftime show and well after any of its unique demands on power supply or power quality had ended,” Grubman said.
Entergy Corp, the utility providing power to the Superdome, said its distribution and transmission feeders were serving the Superdome at all times.
Equipment designed to monitor electrical load sensed an abnormality in the system where the Superdome equipment intersects with Entergy’s feed into the building, triggering an automatic cut in power, Entergy said in a joint statement on Monday with the Superdome’s management company, SMG.
- Goldman Sachs Ensnared in EY Data Breach Earlier This Year
- Agentic Intelligence for Claims Dominates New Tech Launches
- Don’t Sweat the Heatwave, El NiƱo Is Cooking up Some Raucous Weather for California
- Warren, Hawley Press Insurers Over Closed, Unpaid Claims
- The Nation’s Insurance Laboratory: What Liability Trends in California Mean for the Rest of the Country
- Florida Bans Flock Cameras, License Plate Readers From State Roads
- New Corgi, Liberate, VERVE Claims Tech. Do We Need New Acronyms?
- Credit Acceptance Reaches $710M Predatory Auto Lending Settlement With Most States