Corps Will Spend $1.8M on Nebraska Flood Repairs
The U.S. Army Corps of Engineers is planning to spend $1.8 million to repair the flood-defense network around Omaha, Neb.
The repairs being made around Omaha are part of the work being done along the Missouri River to prepare for spring. Last year’s historic flooding along the river damaged many of the levees and drainage ditches and other structures along the river.
The corps says this $1.8 million contract will repair several of the drainage structures around the city and Eppley Airfield.
The contractor will also inspect Omaha’s flood wall to determine what other repairs are needed.
Copyright 2026 Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.
Popular Today
- Secret Codes and Yuan Fees Get Ships Through Iran’s Hormuz Tollbooth
- Top 20 Vehicles Sold in United States in Q1 2026
- Public Adjuster Accused of Swiping $600,000 in Hurricane Ian Insurance Payments
- When the Cloud Goes Dark: Data Center Claims And Specialized Adjusting Expertise
Popular This Month